I'm looking at a grid / skeleton bucket with 2 1/4" x 3" grid for a 3 ton excavator, all I need to do with it is sort rocks from soil, most likely no demo work. I have never had a skeleton bucket before. Does anyone one have any thoughts on size or anything else?
↧